Henan Dowell Crane Co., Ltd.

To Seek the speed, chase the efficiency, guarantee the quality!

Manufacturer from China
Active Member
7 Years
Home / Products / Launcher Crane /

Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min

Contact Now
Henan Dowell Crane Co., Ltd.
City:xinxiang
Province/State:henan
Country/Region:china
Contact Person:MrJune Chao
Contact Now

Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min

Ask Latest Price
Video Channel
Brand Name :Dowellcrane
Model Number :JQJ Beam Launcher Girder Crane
Certification :ISO9001: 2000, CE
Place of Origin :Henan, China
MOQ :1 Set
Payment Terms :L/C, T/T, Western Union
Supply Ability :5000 Sets per Year
Delivery Time :50 work days
Packaging Details :Main body packaged by high quality water-proof plastic woven cloths; spare parts are packed in high quality plywood box.
Running style :Rail
Span :50M
crane travel speed :5m/min
Rated Lifting Moment :500kn
Color :Customized
Sling Type :Wire Rope
Limited switch :include
Voltage lower protection function :include
Warranty :2 years
Power supply :380v 3phase or customized
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Heavy Industry China Manufacturer Bridge Girder Launcher Crane

Product Description

The capacity:60-200ton

The span : 20-50m

Control Mode: Pendant, Remote Control and Cabin Control.

Heavy industry china manufacturer bridge girder launcher crane applied to the construction of the highway. The 300 ton bridge beam launching gantry crane Launcher Girder Crane is the equipment of puting the prefabricated bridge beam on the prefabricated pier. Becasue it's main function is to lift the bridge beam and transport it to the specified location, so 300 ton bridge beam launching gantry crane Launcher Girder Crane also belonged to the bridge crane category . But it's also big different from the normal bridge crane , because it's harsh conditions and working on the beam or called lengthways moving.

Product Advantages

1. Horizontal operation landing the beam in place at one time;

2. Suitable for the construction of inclined (curved) bridge;
3. Light weight, convenient and quick transportation, installation and removal;
4. Safe and reliable work, small longitudinal cantilever deflection;
5. The legs are not landed on bridge deck when longitudinal moving, reducing the pressure on the beam/bridge deck.

Our Service

  • Professional sales team, with full experience of serving international market, can privede you a quick and professional reply, foresee and solve all the problem you may meet.
  • Exclusive engineer team support , can give you the right solution and all related technical help.
  • Senior engineers’ professional installation guide and commissioning on site can provide if needed, and free training for end-user’s operator is also available.
  • 3 year warranty for whole machines, providing all main parts free of charge. Low charge for continue maintenance will provide when warranty is expired.​

Inquiry Notice

If you want to inquire about our launching girder gantry crane, please confirm with us the details as below. Then we will quote you a suitable price more quickly.

1. Lift capacity?
2. Span?
3. Lift height?
4. Power supply in your local?
5. Nearest port?
6. What kind of goods will this crane lift?

Technical Data Sheet

Send your special needs to us!

Span 50m 40m 30m
Type QJ200/50 QJ180/50 QJ160/50 QJ140/40 QJ120/40 QJ100/30 QJ80/30
Rated capacity 200t 180t 160t 140t 120t 100t 60t
Bridge span 30-50m 20-40m 20-30m
Max. slope Longitudinal slope <5% cross slope <5%
Lifting speed 0.41m/min 0.45m/min 0.5m/min 0.56m/min 0.65m/min 0.75m/min 0.9m/min
Trolley longitudinal speed 3m/min
Trolley cross speed 3m/min
Crane slide longitudinal speed 3m/min
Crane side cross travel speed 3m/min
Adaptive inclined bridge angle 0~45°
Adaptive curved bridge radius 400m 300m 200m

Schematic drawing

Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min

Parts Of Crane

Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min


Packing & Delivery

Every product will be tested before shipment.

Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min

The leg height adjustment experiment1

The leg height adjustment experiment2

Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min Heavy Industry Bridge Girder Launching Crane Rail Running 5m/Min

In the leg walking test

Main girder transverse test

Self-locking mechanism test

Packing:

1. Electric parts of 300 ton bridge beam launching gantry crane Launcher Girder Crane are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric winch of 300 ton bridge beam launching gantry crane Launcher Girder Crane are packed by plastic woven cloth. It can reduce abrasion when transport.

Delivery:

1. If the size of whole crane are suitable for container ship, usually by container;

2. If the size is too big, usually by bulk ship or by container after truncation;

3. Transport ways are based on reducing cost for you and keep the crane performance!

Inquiry Cart 0